140 m high residential tower with cantilevering circular section at the top as well as a 5-storey base structure. At the top of the so-called Barrel – the 39th floor – is a restaurant; additional panoramic views are provided by the observation deck on the floor below.
The very distinctive architecture of the building with the barrel and bright northern facade have re-created the old Henninger Turm, a former grain storage silo which featured a revolving restaurant at the top of the tower.
Posizione
Tipologia
Grattacieli e torri
Partecipanti al progetto
Cliente: Ed. Züblin AG, Frankfurt
Il progetto
Elementi chiave
For constructing the barrel-shaped section of the Henninger Turm, a cantilevered working and scaffolding platform up to 8 m long was formed at a height of 100 m on the basis of rentable standard system components in 100 m height.
The upper landing platforms were integrated into the RCS enclosure and climbed crane-independently together with the protection panel unit to the next section in each case. In the floors immediately below, crane-movable RCS MP Landing Platforms served as a temporary storage areas for crane transportation
RCS and TRIO formed rail-guided climbing formwork units for the re-created north side of the former grain storage silo.
For constructing the barrel-shaped section of the Henninger Turm, a cantilevered working and scaffolding platform up to 8 m long was formed at a height of 100 m on the basis of rentable standard system components in 100 m height.
The upper landing platforms were integrated into the RCS enclosure and climbed crane-independently together with the protection panel unit to the next section in each case. In the floors immediately below, crane-movable RCS MP Landing Platforms served as a temporary storage areas for crane transportation
RCS and TRIO formed rail-guided climbing formwork units for the re-created north side of the former grain storage silo.
Informazioni sul progetto
Achim Kurz | Roger Schmitt
Senior Foreman | Senior Site Manager
The project support provided by PERI in the form of planning workflow concepts as well as many other additional services was outstanding. PERI already made a convincing case at the time when the formwork offer was submitted through their innovative ideas and proposed solutions. In the subsequent order processing, the formwork concept could be continually updated while working closely with the contractor and PERI´s technical office, and further optimized for everyone involved in the construction. Here, in addition to the technical feasibility as well as fast scheduling realization, great emphasis was placed on ensuring cost efficiency.